Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

Same reason a top of the line PC tower still has crappy stamped metal frame and crappy injection molded plastic trims.

The main contractor of the elevator unit is a mechanical engineering company, they contract out the control unit to the lowest bidder.



Nope. This was all in house. But we are talking at home lifts for the rich and lazy (and sometimes elderly). And there was quite a bit of electronics in it with processors at each floor, on the control panel and for the motor controller and so on. So the cost added up. But yeah, I agree, some more flash would have been worth it.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: